欧美日韩在线视频,欧美亚洲日本国产,97久久超碰日韩精品,天天干夜夜想

歡迎進入濟南濟柴環(huán)能燃氣發(fā)電設備有限公司官網(wǎng)!

常見問題解答

沼氣發(fā)電機組廠家的操作規(guī)程是什么?

返回 2021.07.16 來源:http://www.vw95.cn 0
一、進料階段
1、 Feeding stage
1、通過管道運輸或人工將豬糞等發(fā)酵原料經(jīng)進料斗過格柵入進料池。
1. Pig manure and other fermentation raw materials are transported by pipeline or manually into the feed tank through the feed hopper through the grid.
2、發(fā)酵原料需加水、沼液調配濃度。
2. The raw materials for fermentation need to be mixed with water and biogas slurry.
3、啟動進料攪拌器,攪拌3-5min后停止攪拌,打開進料管上的進料閥門,啟動進料切割泵。
3. Start the feed agitator, stop mixing after 3-5min, open the feed valve on the feed pipe, and start the feed cutting pump.
4、待進料池物料降至進料界面以下時,即關閉進料切割泵,再關閉進料閥門。
4. When the material in the feed pool falls below the feed interface, close the feed cutting pump, and then close the feed valve.
5、物料進入?yún)捬醢l(fā)酵進行厭氧處理后,每隔24小時通過取樣管進行取樣分析檢測,實時監(jiān)控發(fā)酵狀態(tài)。
5. After the material enters anaerobic fermentation for anaerobic treatment, the sampling pipe is used for sampling analysis and detection every 24 hours to monitor the fermentation state in real time.
6、沼氣發(fā)電機組廠家表示啟動運轉正常后,可陸續(xù)向罐內(nèi)進料,每日進料約9~15立方,待進料量達到容積的85%~90%時,進料停止后,啟動循環(huán)泵3-5min后停止。
6. The biogas generator manufacturer said that after the start-up and operation are normal, it can feed into the tank one after another. The daily feed is about 9-15 cubic meters. When the feed volume reaches 85% - 90% of the volume, the feed is stopped, and the circulating pump is started for 3-5 minutes.
二、出料階段
2、 Discharge stage
1、出料時,緩慢打開溢流管上的出料閥門,打開至1/3~1/2左右,以免出料過快產(chǎn)生負壓。待無沼液排出后,關閉閥門。
1. When discharging, slowly open the discharge valve on the overflow pipe to about 1 / 3 ~ 1 / 2, so as to avoid negative pressure caused by too fast discharging. After no biogas slurry is discharged, close the valve.
2、排泥時,先打開溢流管閥門,后緩慢打開排泥管上的出料閥門,打開至1/3~1/2左右以免出料過快產(chǎn)生負壓。待無大量污泥排出后,關閉排泥管閥門,再關閉溢流管閥門。
2. When discharging sludge, first open the overflow pipe valve, and then slowly open the discharge valve on the sludge discharge pipe to about 1 / 3 ~ 1 / 2, so as to avoid negative pressure caused by too fast discharging. After no large amount of sludge is discharged, close the valve of sludge discharge pipe and then close the valve of overflow pipe.
三、使用階段
3、 Use stage
1、沼氣火炬具備自動點火功能,當氣柜內(nèi)沼氣過多,自動進入沼氣火炬內(nèi)。
1. The biogas torch has the function of automatic ignition. When there is too much biogas in the gas holder, it will automatically enter into the biogas torch.
2、使用發(fā)電機時,打開發(fā)電機進氣閥門,按照沼氣發(fā)電機組操作規(guī)程操作。
2. When using the generator, open the air inlet valve of the generator and operate according to the operating procedures of biogas generator set.
3、使用鍋爐時,打開鍋爐進氣閥門,按照沼氣鍋爐使用說明操作。
3. When using the boiler, open the air inlet valve of the boiler and operate according to the operating instructions of the biogas boiler.
4、正常使用時脫水脫硫閥門正常打開,需要維修時由工程技術人員關閉閥門進行維修,脫水脫硫罐每隔3-7天打開排水閥門進行排水。
4. In normal use, the dehydration and desulfurization valve is normally opened. When maintenance is needed, the engineering and technical personnel shall close the valve for maintenance. The dehydration and desulfurization tank shall open the drainage valve every 3-7 days for drainage.
新聞搜索
濟南濟柴環(huán)能燃氣發(fā)電設備有限公司
  • 服務熱線

    0531-62325028
    0531-69951266

沼氣發(fā)電機組廠家的操作規(guī)程是什么?

一、進料階段
1、 Feeding stage
1、通過管道運輸或人工將豬糞等發(fā)酵原料經(jīng)進料斗過格柵入進料池。
1. Pig manure and other fermentation raw materials are transported by pipeline or manually into the feed tank through the feed hopper through the grid.
2、發(fā)酵原料需加水、沼液調配濃度。
2. The raw materials for fermentation need to be mixed with water and biogas slurry.
3、啟動進料攪拌器,攪拌3-5min后停止攪拌,打開進料管上的進料閥門,啟動進料切割泵。
3. Start the feed agitator, stop mixing after 3-5min, open the feed valve on the feed pipe, and start the feed cutting pump.
4、待進料池物料降至進料界面以下時,即關閉進料切割泵,再關閉進料閥門。
4. When the material in the feed pool falls below the feed interface, close the feed cutting pump, and then close the feed valve.
5、物料進入?yún)捬醢l(fā)酵進行厭氧處理后,每隔24小時通過取樣管進行取樣分析檢測,實時監(jiān)控發(fā)酵狀態(tài)。
5. After the material enters anaerobic fermentation for anaerobic treatment, the sampling pipe is used for sampling analysis and detection every 24 hours to monitor the fermentation state in real time.
6、沼氣發(fā)電機組廠家表示啟動運轉正常后,可陸續(xù)向罐內(nèi)進料,每日進料約9~15立方,待進料量達到容積的85%~90%時,進料停止后,啟動循環(huán)泵3-5min后停止。
6. The biogas generator manufacturer said that after the start-up and operation are normal, it can feed into the tank one after another. The daily feed is about 9-15 cubic meters. When the feed volume reaches 85% - 90% of the volume, the feed is stopped, and the circulating pump is started for 3-5 minutes.
二、出料階段
2、 Discharge stage
1、出料時,緩慢打開溢流管上的出料閥門,打開至1/3~1/2左右,以免出料過快產(chǎn)生負壓。待無沼液排出后,關閉閥門。
1. When discharging, slowly open the discharge valve on the overflow pipe to about 1 / 3 ~ 1 / 2, so as to avoid negative pressure caused by too fast discharging. After no biogas slurry is discharged, close the valve.
2、排泥時,先打開溢流管閥門,后緩慢打開排泥管上的出料閥門,打開至1/3~1/2左右以免出料過快產(chǎn)生負壓。待無大量污泥排出后,關閉排泥管閥門,再關閉溢流管閥門。
2. When discharging sludge, first open the overflow pipe valve, and then slowly open the discharge valve on the sludge discharge pipe to about 1 / 3 ~ 1 / 2, so as to avoid negative pressure caused by too fast discharging. After no large amount of sludge is discharged, close the valve of sludge discharge pipe and then close the valve of overflow pipe.
三、使用階段
3、 Use stage
1、沼氣火炬具備自動點火功能,當氣柜內(nèi)沼氣過多,自動進入沼氣火炬內(nèi)。
1. The biogas torch has the function of automatic ignition. When there is too much biogas in the gas holder, it will automatically enter into the biogas torch.
2、使用發(fā)電機時,打開發(fā)電機進氣閥門,按照沼氣發(fā)電機組操作規(guī)程操作。
2. When using the generator, open the air inlet valve of the generator and operate according to the operating procedures of biogas generator set.
3、使用鍋爐時,打開鍋爐進氣閥門,按照沼氣鍋爐使用說明操作。
3. When using the boiler, open the air inlet valve of the boiler and operate according to the operating instructions of the biogas boiler.
4、正常使用時脫水脫硫閥門正常打開,需要維修時由工程技術人員關閉閥門進行維修,脫水脫硫罐每隔3-7天打開排水閥門進行排水。
4. In normal use, the dehydration and desulfurization valve is normally opened. When maintenance is needed, the engineering and technical personnel shall close the valve for maintenance. The dehydration and desulfurization tank shall open the drainage valve every 3-7 days for drainage.