1、天燃?xì)獍l(fā)電機組機房應(yīng)遠(yuǎn)離明火區(qū)域;

1. The natural gas generator room should be kept away from open flame areas;

2、機房應(yīng)寬敞、明亮且要求安裝換氣扇以保證良好的通風(fēng);

2. The computer room should be spacious, bright, and require the installation of ventilation fans to ensure good ventilation;

3、機組安裝時底盤與地基應(yīng)用平墊鐵找平。接觸面積應(yīng)在60%以上,且分布均勻;

3. During the installation of the unit, the chassis and foundation should be leveled with flat iron pads. The contact area should be over 60% and evenly distributed;

4、室內(nèi)安裝照明、開關(guān)、線路及其電器應(yīng)采用防爆措施,且固定牢固;

4. Indoor installation of lighting, switches, circuits and their electrical appliances should adopt explosion-proof measures and be firmly fixed;

base64_image

5、燃?xì)獍l(fā)電機組機房內(nèi)應(yīng)符合消防要求,配備滅火器等消防器械;

5. The gas generator room should meet fire protection requirements and be equipped with fire extinguishers and other fire-fighting equipment;

6、機房內(nèi)安裝可燃?xì)怏w報警裝置,可燃?xì)怏w泄露時能及時發(fā)現(xiàn);

6. Install combustible gas alarm devices in the computer room, which can detect combustible gas leaks in a timely manner;

7、60kw以下單臺燃?xì)獍l(fā)動機燃?xì)夤苈返耐獠恐饕艿纼?nèi)徑應(yīng)不小于2吋,靠近發(fā)動機的部分內(nèi)徑應(yīng)不小于1吋。60kw以上燃?xì)獍l(fā)電機組則分別是3吋和兩吋。且必須安裝燃?xì)忾y門(不銹鋼球閥)、型放水閥、防回火裝置,燃?xì)夤苈泛附油瓿蓱?yīng)清理焊渣(用高壓空氣);

7. The inner diameter of the external main pipeline of the gas pipeline of a single gas engine below 60kW should not be less than 2 inches, and the inner diameter of the part near the engine should not be less than 1 inch. For gas generators above 60kW, they are 3 inches and 2 inches respectively. And it is necessary to install gas valves (stainless steel ball valves), type drain valves, and anti tempering devices. After welding the gas pipeline, welding slag should be cleaned (using high-pressure air);

8、燃?xì)獗仨毭摿?、脫水、除塵,其中含硫量≤0.25Nm3,氫氣≤10%

8. Gas must undergo desulfurization, dehydration, and dust removal, with sulfur content ≤ 0.25Nm3 and hydrogen content ≤ 10%

以上的文章由濟南濟柴環(huán)能燃?xì)獍l(fā)電設(shè)備有限公司沼氣發(fā)電機組提供分享,更多內(nèi)容請關(guān)注我們:http://www.vw95.cn

The above article is shared by Jinan Jichai Environmental Energy Gas Power Generation Equipment Co., Ltd.'s biogas generator unit. For more content, please follow us: http://www.vw95.cn

新聞搜索
濟南濟柴環(huán)能燃?xì)獍l(fā)電設(shè)備有限公司
  • 服務(wù)熱線

    0531-62325028
    0531-69951266

天燃?xì)獍l(fā)電機組使用注意事項

1、天燃?xì)獍l(fā)電機組機房應(yīng)遠(yuǎn)離明火區(qū)域;

1. The natural gas generator room should be kept away from open flame areas;

2、機房應(yīng)寬敞、明亮且要求安裝換氣扇以保證良好的通風(fēng);

2. The computer room should be spacious, bright, and require the installation of ventilation fans to ensure good ventilation;

3、機組安裝時底盤與地基應(yīng)用平墊鐵找平。接觸面積應(yīng)在60%以上,且分布均勻;

3. During the installation of the unit, the chassis and foundation should be leveled with flat iron pads. The contact area should be over 60% and evenly distributed;

4、室內(nèi)安裝照明、開關(guān)、線路及其電器應(yīng)采用防爆措施,且固定牢固;

4. Indoor installation of lighting, switches, circuits and their electrical appliances should adopt explosion-proof measures and be firmly fixed;

base64_image

5、燃?xì)獍l(fā)電機組機房內(nèi)應(yīng)符合消防要求,配備滅火器等消防器械;

5. The gas generator room should meet fire protection requirements and be equipped with fire extinguishers and other fire-fighting equipment;

6、機房內(nèi)安裝可燃?xì)怏w報警裝置,可燃?xì)怏w泄露時能及時發(fā)現(xiàn);

6. Install combustible gas alarm devices in the computer room, which can detect combustible gas leaks in a timely manner;

7、60kw以下單臺燃?xì)獍l(fā)動機燃?xì)夤苈返耐獠恐饕艿纼?nèi)徑應(yīng)不小于2吋,靠近發(fā)動機的部分內(nèi)徑應(yīng)不小于1吋。60kw以上燃?xì)獍l(fā)電機組則分別是3吋和兩吋。且必須安裝燃?xì)忾y門(不銹鋼球閥)、型放水閥、防回火裝置,燃?xì)夤苈泛附油瓿蓱?yīng)清理焊渣(用高壓空氣);

7. The inner diameter of the external main pipeline of the gas pipeline of a single gas engine below 60kW should not be less than 2 inches, and the inner diameter of the part near the engine should not be less than 1 inch. For gas generators above 60kW, they are 3 inches and 2 inches respectively. And it is necessary to install gas valves (stainless steel ball valves), type drain valves, and anti tempering devices. After welding the gas pipeline, welding slag should be cleaned (using high-pressure air);

8、燃?xì)獗仨毭摿颉⒚撍?、除塵,其中含硫量≤0.25Nm3,氫氣≤10%

8. Gas must undergo desulfurization, dehydration, and dust removal, with sulfur content ≤ 0.25Nm3 and hydrogen content ≤ 10%