(1)在12臺(tái)500KW瓦斯發(fā)電機(jī)組煙道出口各安裝一套熱管空預(yù)器,每臺(tái)瓦斯發(fā)電機(jī)組的煙氣流量為2130Nm3/h,可加熱的冷空氣流量為30000Nm3/h,空氣流通阻力小于500Pa,采用兩臺(tái)大功率(45kw)風(fēng)機(jī),將空氣集中加壓送入熱管換熱器中,熱交換后的空氣通過(guò)保溫管道和涵洞輸送到煤礦進(jìn)風(fēng)井進(jìn)入井下暖井。
(1) A set of heat pipe air preheater is installed at the flue outlet of each of the 12 500 KW gas generator units. The flue gas flow rate of each gas generator unit is 2130 Nm3/h, the heating cold air flow rate is 30000 Nm3/h, and the air circulation resistance is less than 500 Pa. Two high-power (45 kw) fans are used to pressurize the air into the heat pipe heat exchanger, and the heat exchanged air is transported to the coal mine air inlet shaft through thermal insulation pipes and culverts to enter the underground warming shaft.
(2)為了防止瓦斯發(fā)電機(jī)組尾氣泄漏進(jìn)入井下和井下有害氣體反送,在熱管空預(yù)器熱風(fēng)出口處設(shè)計(jì)了單向止逆電動(dòng)風(fēng)門(mén),并安裝了溫度、流量、有害氣體傳感器等輸送監(jiān)控聯(lián)動(dòng)系統(tǒng),發(fā)生瓦斯發(fā)電機(jī)組尾氣泄漏和井下有害氣體反送時(shí),單向止逆電動(dòng)風(fēng)門(mén)將自動(dòng)關(guān)閉,熱風(fēng)機(jī)斷電跳閘關(guān)閉。
(2) In order to prevent the leakage of tail gas from the gas generator unit into the underground and the backflow of harmful gas, a one-way check electric damper is designed at the hot air outlet of the heat pipe air preheater, and a transmission monitoring linkage system such as temperature, flow, and harmful gas sensors is installed. When the leakage of tail gas from the gas generator unit and the backflow of harmful gas in the underground occur, the one-way check electric damper will automatically close, and the hot air fan will be powered off and tripped to close.
8.jpg
8.jpg
(3)安裝后的效果:在冬季零下22℃時(shí),進(jìn)入風(fēng)井的熱風(fēng)流量為24000Nm3/h,入井初始熱風(fēng)溫度62℃,完全達(dá)到熱風(fēng)設(shè)計(jì)要求。
(3) Effect after installation: In winter, at minus 22 ℃, the hot air flow into the air shaft is 24000 Nm3/h, and the initial hot air temperature into the shaft is 62 ℃, fully meeting the hot air design requirements.
瓦斯發(fā)電機(jī)組
2.3、利用瓦斯發(fā)電機(jī)組尾氣余熱產(chǎn)生飽和蒸汽供生產(chǎn)工藝使用或者進(jìn)行余熱發(fā)電
2.3. Utilize the waste heat from the tail gas of the gas generator unit to generate saturated steam for use in the production process or for waste heat power generation
以2臺(tái)500kW瓦斯發(fā)電機(jī)組余熱為例,安裝熱管蒸發(fā)器,可以得到壓力為0.5MPa壓力的飽和蒸汽0.75噸/小時(shí)。
Taking the waste heat of two 500 kW gas generating units as an example, installing a heat pipe evaporator can obtain 0.75 tons/hour of saturated steam at a pressure of 0.5 MPa.
低濃度瓦斯發(fā)電機(jī)組余熱回收的經(jīng)濟(jì)分析
Economic Analysis of Waste Heat Recovery for Low Concentration Gas Generating Units
余熱回收熱量可供采暖的面積
Area available for heating by waste heat recovery
500KW低濃度瓦斯發(fā)電機(jī)組煙道出口尾氣溫度一般在550℃,尾氣流量2130Nm3/h,尾氣密度ρ=1.293kg/Nm3,尾氣比熱C=0.257kcal/kg.℃,經(jīng)熱管換熱器換熱后尾氣溫度降至150℃;
The exhaust gas temperature at the flue outlet of a 500KW low concentration gas generator unit is generally 550 ℃, the exhaust gas flow rate is 2130Nm3/h, and the exhaust gas density is ρ= 1.293kg/Nm3, specific heat of tail gas C=0.257kcal/kg. ℃, and the temperature of tail gas decreases to 150 ℃ after heat exchange by heat pipe heat exchanger;
瓦斯發(fā)電機(jī)組尾氣由550℃降至150℃時(shí),釋放的熱量Q為:
When the tail gas of the gas generator unit decreases from 550 ℃ to 150 ℃, the heat Q released is:
Q=CM(T2-T1)=0.257×1.293×2130(550-150)=2.83×105kcal/h
Q=CM(T2-T1)=0.257 × one point two nine three × 2130(550-150)=2.83 × 105kcal/h
熱管換熱器換熱效率按照η=95%計(jì)算,則每臺(tái)瓦斯發(fā)電機(jī)組可回收熱量為:
Heat exchange efficiency of heat pipe heat exchanger shall be in accordance with η= Based on 95% calculation, the recoverable heat of each gas generator unit is:
Q1=2.83×105×95%=268850kcal/h
Q1=2.83 × one hundred and five × 95%=268850kcal/h
余熱回收利用后,單臺(tái)機(jī)組可供熱的建筑面積為(單位面積所需熱量按60kcal/m2):
After waste heat recovery and utilization, the building area that can be heated by a single unit is (the required heat per unit area is 60 kcal/m2):
余熱回收熱量可供洗浴的水量
Amount of water available for bathing after heat recovery
二次處理后的煤礦礦井水質(zhì)量完全可以滿足職工浴池的洗浴需要,礦井水平均溫度在20℃左右,通過(guò)熱管換熱器(熱管省煤器)加熱后的水溫可以達(dá)到50℃以上,通過(guò)管道泵向浴池輸送,即洗浴水溫提30℃。
The quality of coal mine water after secondary treatment can fully meet the bathing needs of employees in the bathtub. The average horizontal temperature of the mine is around 20 ℃, and the minimum water temperature after heating through a heat pipe heat exchanger (heat pipe economizer) can reach over 50 ℃. The water is transported to the bathtub through a pipeline pump, that is, the bathing water temperature is increased by 30 ℃.
則單臺(tái)發(fā)電機(jī)組每小時(shí)可供50℃以上的礦井水量為:Q1/A2=9m3
The hourly mine water supply of a single generator unit above 50 ℃ is: Q1/A2=9m3
則單臺(tái)機(jī)組每天可供50℃以上礦井水量為:24×9=216m3
The daily mine water supply of a single unit above 50 ℃ is: 24 × 9=216m3
新聞搜索
濟(jì)南濟(jì)柴環(huán)能燃?xì)獍l(fā)電設(shè)備有限公司
  • 服務(wù)熱線

    0531-62325028
    0531-69951266

煤礦利用發(fā)電機(jī)組尾氣余熱向風(fēng)井送熱風(fēng)暖井

(1)在12臺(tái)500KW瓦斯發(fā)電機(jī)組煙道出口各安裝一套熱管空預(yù)器,每臺(tái)瓦斯發(fā)電機(jī)組的煙氣流量為2130Nm3/h,可加熱的冷空氣流量為30000Nm3/h,空氣流通阻力小于500Pa,采用兩臺(tái)大功率(45kw)風(fēng)機(jī),將空氣集中加壓送入熱管換熱器中,熱交換后的空氣通過(guò)保溫管道和涵洞輸送到煤礦進(jìn)風(fēng)井進(jìn)入井下暖井。
(1) A set of heat pipe air preheater is installed at the flue outlet of each of the 12 500 KW gas generator units. The flue gas flow rate of each gas generator unit is 2130 Nm3/h, the heating cold air flow rate is 30000 Nm3/h, and the air circulation resistance is less than 500 Pa. Two high-power (45 kw) fans are used to pressurize the air into the heat pipe heat exchanger, and the heat exchanged air is transported to the coal mine air inlet shaft through thermal insulation pipes and culverts to enter the underground warming shaft.
(2)為了防止瓦斯發(fā)電機(jī)組尾氣泄漏進(jìn)入井下和井下有害氣體反送,在熱管空預(yù)器熱風(fēng)出口處設(shè)計(jì)了單向止逆電動(dòng)風(fēng)門(mén),并安裝了溫度、流量、有害氣體傳感器等輸送監(jiān)控聯(lián)動(dòng)系統(tǒng),發(fā)生瓦斯發(fā)電機(jī)組尾氣泄漏和井下有害氣體反送時(shí),單向止逆電動(dòng)風(fēng)門(mén)將自動(dòng)關(guān)閉,熱風(fēng)機(jī)斷電跳閘關(guān)閉。
(2) In order to prevent the leakage of tail gas from the gas generator unit into the underground and the backflow of harmful gas, a one-way check electric damper is designed at the hot air outlet of the heat pipe air preheater, and a transmission monitoring linkage system such as temperature, flow, and harmful gas sensors is installed. When the leakage of tail gas from the gas generator unit and the backflow of harmful gas in the underground occur, the one-way check electric damper will automatically close, and the hot air fan will be powered off and tripped to close.
8.jpg
8.jpg
(3)安裝后的效果:在冬季零下22℃時(shí),進(jìn)入風(fēng)井的熱風(fēng)流量為24000Nm3/h,入井初始熱風(fēng)溫度62℃,完全達(dá)到熱風(fēng)設(shè)計(jì)要求。
(3) Effect after installation: In winter, at minus 22 ℃, the hot air flow into the air shaft is 24000 Nm3/h, and the initial hot air temperature into the shaft is 62 ℃, fully meeting the hot air design requirements.
瓦斯發(fā)電機(jī)組
2.3、利用瓦斯發(fā)電機(jī)組尾氣余熱產(chǎn)生飽和蒸汽供生產(chǎn)工藝使用或者進(jìn)行余熱發(fā)電
2.3. Utilize the waste heat from the tail gas of the gas generator unit to generate saturated steam for use in the production process or for waste heat power generation
以2臺(tái)500kW瓦斯發(fā)電機(jī)組余熱為例,安裝熱管蒸發(fā)器,可以得到壓力為0.5MPa壓力的飽和蒸汽0.75噸/小時(shí)。
Taking the waste heat of two 500 kW gas generating units as an example, installing a heat pipe evaporator can obtain 0.75 tons/hour of saturated steam at a pressure of 0.5 MPa.
低濃度瓦斯發(fā)電機(jī)組余熱回收的經(jīng)濟(jì)分析
Economic Analysis of Waste Heat Recovery for Low Concentration Gas Generating Units
余熱回收熱量可供采暖的面積
Area available for heating by waste heat recovery
500KW低濃度瓦斯發(fā)電機(jī)組煙道出口尾氣溫度一般在550℃,尾氣流量2130Nm3/h,尾氣密度ρ=1.293kg/Nm3,尾氣比熱C=0.257kcal/kg.℃,經(jīng)熱管換熱器換熱后尾氣溫度降至150℃;
The exhaust gas temperature at the flue outlet of a 500KW low concentration gas generator unit is generally 550 ℃, the exhaust gas flow rate is 2130Nm3/h, and the exhaust gas density is ρ= 1.293kg/Nm3, specific heat of tail gas C=0.257kcal/kg. ℃, and the temperature of tail gas decreases to 150 ℃ after heat exchange by heat pipe heat exchanger;
瓦斯發(fā)電機(jī)組尾氣由550℃降至150℃時(shí),釋放的熱量Q為:
When the tail gas of the gas generator unit decreases from 550 ℃ to 150 ℃, the heat Q released is:
Q=CM(T2-T1)=0.257×1.293×2130(550-150)=2.83×105kcal/h
Q=CM(T2-T1)=0.257 × one point two nine three × 2130(550-150)=2.83 × 105kcal/h
熱管換熱器換熱效率按照η=95%計(jì)算,則每臺(tái)瓦斯發(fā)電機(jī)組可回收熱量為:
Heat exchange efficiency of heat pipe heat exchanger shall be in accordance with η= Based on 95% calculation, the recoverable heat of each gas generator unit is:
Q1=2.83×105×95%=268850kcal/h
Q1=2.83 × one hundred and five × 95%=268850kcal/h
余熱回收利用后,單臺(tái)機(jī)組可供熱的建筑面積為(單位面積所需熱量按60kcal/m2):
After waste heat recovery and utilization, the building area that can be heated by a single unit is (the required heat per unit area is 60 kcal/m2):
余熱回收熱量可供洗浴的水量
Amount of water available for bathing after heat recovery
二次處理后的煤礦礦井水質(zhì)量完全可以滿足職工浴池的洗浴需要,礦井水平均溫度在20℃左右,通過(guò)熱管換熱器(熱管省煤器)加熱后的水溫可以達(dá)到50℃以上,通過(guò)管道泵向浴池輸送,即洗浴水溫提30℃。
The quality of coal mine water after secondary treatment can fully meet the bathing needs of employees in the bathtub. The average horizontal temperature of the mine is around 20 ℃, and the minimum water temperature after heating through a heat pipe heat exchanger (heat pipe economizer) can reach over 50 ℃. The water is transported to the bathtub through a pipeline pump, that is, the bathing water temperature is increased by 30 ℃.
則單臺(tái)發(fā)電機(jī)組每小時(shí)可供50℃以上的礦井水量為:Q1/A2=9m3
The hourly mine water supply of a single generator unit above 50 ℃ is: Q1/A2=9m3
則單臺(tái)機(jī)組每天可供50℃以上礦井水量為:24×9=216m3
The daily mine water supply of a single unit above 50 ℃ is: 24 × 9=216m3