欧美日韩在线视频,欧美亚洲日本国产,97久久超碰日韩精品,天天干夜夜想

歡迎進(jìn)入濟(jì)南濟(jì)柴環(huán)能燃?xì)獍l(fā)電設(shè)備有限公司官網(wǎng)!

發(fā)電機(jī)知識(shí)

發(fā)電機(jī)組開(kāi)車(chē)前檢查確認(rèn)無(wú)誤后才能開(kāi)車(chē)

返回 2022.07.25 來(lái)源:http://www.vw95.cn 0
瓦斯發(fā)電機(jī)組開(kāi)車(chē)前檢查確認(rèn)無(wú)誤后才允許開(kāi)車(chē),這是使得發(fā)電機(jī)組正常運(yùn)行的需要,也是對(duì)機(jī)組的維護(hù)保養(yǎng)措施,具體內(nèi)容小編來(lái)介紹相關(guān)內(nèi)容。
The gas generator set can only be started after it is checked and confirmed to be correct before starting, which is the need for the normal operation of the generator set and the maintenance measures for the unit. The specific contents are introduced in the sub series.
管系
Piping system
1、瓦斯氣源管線與瓦斯機(jī)進(jìn)氣接口處須安裝密封墊片并使得緊固可靠,應(yīng)急手動(dòng)停車(chē)閥門(mén)功能應(yīng)可靠。
1. The sealing gasket must be installed at the interface between the gas source pipeline and the gas inlet of the gas machine to make it firm and reliable, and the function of the emergency manual shutdown valve should be reliable.
2、瓦斯管線的螺紋連接處須加纏密封膠帶,焊接部位不得有氣孔。
2. The threaded connection of gas pipeline must be wrapped with sealing tape, and the welding part must not have pores.
3、檢查機(jī)房?jī)?nèi)管線是否漏氣,如有泄漏,須處理后再開(kāi)機(jī)。
3. Check whether the pipeline in the machine room leaks. If there is any leakage, it must be treated before starting the machine.
部件的安裝
Installation of components
1、混合器法蘭及蝶門(mén)軸頸徑向間隙不得漏氣。
1. The radial clearance of mixer flange and butterfly door journal shall be free of air leakage.
2、電磁閥、調(diào)壓閥的連接不得松動(dòng)漏氣。
2. The connection of solenoid valve and pressure regulating valve shall not be loose or leak.
3、各防爆裝置的易熔易爆膜片須按照技術(shù)設(shè)計(jì)要求安裝,不得隨意更換材料或加厚。
3. The fusible and explosive diaphragm of each explosion-proof device must be installed according to the technical design requirements, and it is not allowed to change materials or thicken at will.
4、瓦斯發(fā)電機(jī)組和控制屏與電纜接頭的連接須緊固可靠。
4. The connection between the gas generator set and the control panel and the cable connector must be firm and reliable.
傳感器與控制屏組合模擬檢測(cè)
Combined analog detection of sensor and control panel
1、油壓檢測(cè):裝有壓力繼電器的原動(dòng)機(jī),用壓力校驗(yàn)儀檢測(cè)設(shè)定值,檢查控制屏是否分閘停機(jī)。裝有監(jiān)控儀的原動(dòng)機(jī),先自檢,然后拆下信號(hào)輸入線檢查控制屏是否分閘停機(jī)。
1. Oil pressure detection: for the prime mover equipped with pressure relay, use the pressure calibrator to detect the set value and check whether the control panel is opened and shut down. For the prime mover equipped with a monitor, first conduct self-test, and then remove the signal input line to check whether the control panel is switched off and shut down.
瓦斯發(fā)電機(jī)組
2、油溫、水溫檢測(cè):將模擬檢測(cè)好的傳感器與傳感器導(dǎo)線連接,把傳感器放在排氣管上加溫,檢測(cè)是否在設(shè)定值上分閘停機(jī)。
2. Oil temperature and water temperature detection: connect the analog detected sensor with the sensor wire, place the sensor on the exhaust pipe for heating, and detect whether the switch is opened and shut down at the set value.
3、檢查發(fā)電機(jī)組氣源應(yīng)急閥門(mén)、電磁閥是否可靠。
3. Check whether the air source emergency valve and solenoid valve of the generator set are reliable.
4、減掉負(fù)載,合上短路器開(kāi)關(guān),把轉(zhuǎn)速開(kāi)關(guān)設(shè)置到額定轉(zhuǎn)速位置,然后調(diào)整2301A速度控制器的額定轉(zhuǎn)速電位器,緩慢順時(shí)針旋轉(zhuǎn)直至機(jī)組在設(shè)定
4. Reduce the load, close the breaker switch, set the speed switch to the rated speed position, then adjust the rated speed potentiometer of 2301a speed controller, and slowly rotate clockwise until the unit is set
值報(bào)警分閘、超速停機(jī)為止,然后將額定轉(zhuǎn)速電位器逆時(shí)針復(fù)位到原來(lái)的位置。
Value alarm until opening and overspeed shutdown, and then reset the rated speed potentiometer counterclockwise to the original position.
機(jī)組
crew
1、開(kāi)機(jī)前,應(yīng)清理機(jī)組(旋轉(zhuǎn)部件)上放置的雜物(如盤(pán)車(chē)杠、工具、螺釘?shù)龋悦忾_(kāi)車(chē)時(shí)工件飛出去傷人。
1. Before starting the machine, the sundries (such as turning bar, tools, screws, etc.) placed on the unit (rotating parts) should be cleaned to prevent the workpiece from flying out and hurting people during driving.
2、開(kāi)機(jī)前手動(dòng)盤(pán)車(chē)時(shí),注意先斷開(kāi)起動(dòng)電源,以免誤觸動(dòng)起動(dòng)按鈕,盤(pán)車(chē)杠飛出去傷人。
2. When turning manually before starting the machine, pay attention to disconnect the starting power first, so as not to touch the start button by mistake, and the turning bar will fly out and hurt people.
以上就是介紹的關(guān)于發(fā)電機(jī)組開(kāi)車(chē)前,檢查確認(rèn)無(wú)誤后才允許開(kāi)車(chē)的相關(guān)內(nèi)容,希望能給用戶(hù)帶來(lái)參考。更多內(nèi)容的了解還是來(lái)網(wǎng)站http://www.vw95.cn咨詢(xún)吧。
The above is about the relevant content that the generator set is allowed to start up only after it is checked and confirmed to be correct before starting up. I hope it can bring reference to users. For more information, please visit the website http://www.vw95.cn Consult.
新聞搜索
濟(jì)南濟(jì)柴環(huán)能燃?xì)獍l(fā)電設(shè)備有限公司
  • 服務(wù)熱線

    0531-62325028
    0531-69951266

發(fā)電機(jī)組開(kāi)車(chē)前檢查確認(rèn)無(wú)誤后才能開(kāi)車(chē)

瓦斯發(fā)電機(jī)組開(kāi)車(chē)前檢查確認(rèn)無(wú)誤后才允許開(kāi)車(chē),這是使得發(fā)電機(jī)組正常運(yùn)行的需要,也是對(duì)機(jī)組的維護(hù)保養(yǎng)措施,具體內(nèi)容小編來(lái)介紹相關(guān)內(nèi)容。
The gas generator set can only be started after it is checked and confirmed to be correct before starting, which is the need for the normal operation of the generator set and the maintenance measures for the unit. The specific contents are introduced in the sub series.
管系
Piping system
1、瓦斯氣源管線與瓦斯機(jī)進(jìn)氣接口處須安裝密封墊片并使得緊固可靠,應(yīng)急手動(dòng)停車(chē)閥門(mén)功能應(yīng)可靠。
1. The sealing gasket must be installed at the interface between the gas source pipeline and the gas inlet of the gas machine to make it firm and reliable, and the function of the emergency manual shutdown valve should be reliable.
2、瓦斯管線的螺紋連接處須加纏密封膠帶,焊接部位不得有氣孔。
2. The threaded connection of gas pipeline must be wrapped with sealing tape, and the welding part must not have pores.
3、檢查機(jī)房?jī)?nèi)管線是否漏氣,如有泄漏,須處理后再開(kāi)機(jī)。
3. Check whether the pipeline in the machine room leaks. If there is any leakage, it must be treated before starting the machine.
部件的安裝
Installation of components
1、混合器法蘭及蝶門(mén)軸頸徑向間隙不得漏氣。
1. The radial clearance of mixer flange and butterfly door journal shall be free of air leakage.
2、電磁閥、調(diào)壓閥的連接不得松動(dòng)漏氣。
2. The connection of solenoid valve and pressure regulating valve shall not be loose or leak.
3、各防爆裝置的易熔易爆膜片須按照技術(shù)設(shè)計(jì)要求安裝,不得隨意更換材料或加厚。
3. The fusible and explosive diaphragm of each explosion-proof device must be installed according to the technical design requirements, and it is not allowed to change materials or thicken at will.
4、瓦斯發(fā)電機(jī)組和控制屏與電纜接頭的連接須緊固可靠。
4. The connection between the gas generator set and the control panel and the cable connector must be firm and reliable.
傳感器與控制屏組合模擬檢測(cè)
Combined analog detection of sensor and control panel
1、油壓檢測(cè):裝有壓力繼電器的原動(dòng)機(jī),用壓力校驗(yàn)儀檢測(cè)設(shè)定值,檢查控制屏是否分閘停機(jī)。裝有監(jiān)控儀的原動(dòng)機(jī),先自檢,然后拆下信號(hào)輸入線檢查控制屏是否分閘停機(jī)。
1. Oil pressure detection: for the prime mover equipped with pressure relay, use the pressure calibrator to detect the set value and check whether the control panel is opened and shut down. For the prime mover equipped with a monitor, first conduct self-test, and then remove the signal input line to check whether the control panel is switched off and shut down.
瓦斯發(fā)電機(jī)組
2、油溫、水溫檢測(cè):將模擬檢測(cè)好的傳感器與傳感器導(dǎo)線連接,把傳感器放在排氣管上加溫,檢測(cè)是否在設(shè)定值上分閘停機(jī)。
2. Oil temperature and water temperature detection: connect the analog detected sensor with the sensor wire, place the sensor on the exhaust pipe for heating, and detect whether the switch is opened and shut down at the set value.
3、檢查發(fā)電機(jī)組氣源應(yīng)急閥門(mén)、電磁閥是否可靠。
3. Check whether the air source emergency valve and solenoid valve of the generator set are reliable.
4、減掉負(fù)載,合上短路器開(kāi)關(guān),把轉(zhuǎn)速開(kāi)關(guān)設(shè)置到額定轉(zhuǎn)速位置,然后調(diào)整2301A速度控制器的額定轉(zhuǎn)速電位器,緩慢順時(shí)針旋轉(zhuǎn)直至機(jī)組在設(shè)定
4. Reduce the load, close the breaker switch, set the speed switch to the rated speed position, then adjust the rated speed potentiometer of 2301a speed controller, and slowly rotate clockwise until the unit is set
值報(bào)警分閘、超速停機(jī)為止,然后將額定轉(zhuǎn)速電位器逆時(shí)針復(fù)位到原來(lái)的位置。
Value alarm until opening and overspeed shutdown, and then reset the rated speed potentiometer counterclockwise to the original position.
機(jī)組
crew
1、開(kāi)機(jī)前,應(yīng)清理機(jī)組(旋轉(zhuǎn)部件)上放置的雜物(如盤(pán)車(chē)杠、工具、螺釘?shù)龋?,以免開(kāi)車(chē)時(shí)工件飛出去傷人。
1. Before starting the machine, the sundries (such as turning bar, tools, screws, etc.) placed on the unit (rotating parts) should be cleaned to prevent the workpiece from flying out and hurting people during driving.
2、開(kāi)機(jī)前手動(dòng)盤(pán)車(chē)時(shí),注意先斷開(kāi)起動(dòng)電源,以免誤觸動(dòng)起動(dòng)按鈕,盤(pán)車(chē)杠飛出去傷人。
2. When turning manually before starting the machine, pay attention to disconnect the starting power first, so as not to touch the start button by mistake, and the turning bar will fly out and hurt people.
以上就是介紹的關(guān)于發(fā)電機(jī)組開(kāi)車(chē)前,檢查確認(rèn)無(wú)誤后才允許開(kāi)車(chē)的相關(guān)內(nèi)容,希望能給用戶(hù)帶來(lái)參考。更多內(nèi)容的了解還是來(lái)網(wǎng)站http://www.vw95.cn咨詢(xún)吧。
The above is about the relevant content that the generator set is allowed to start up only after it is checked and confirmed to be correct before starting up. I hope it can bring reference to users. For more information, please visit the website http://www.vw95.cn Consult.